What’s in the Box | Episode 000 | IoT vs IIoT, Edge, and Hybrid Data
What's in the Box | Episode 000 | IoT vs IIoT, Edge, and Hybrid Data We're officially starting a weekly Linkedin Live show (every Thursday at 4pm CST) on our…
What's in the Box | Episode 000 | IoT vs IIoT, Edge, and Hybrid Data We're officially starting a weekly Linkedin Live show (every Thursday at 4pm CST) on our…
As a control systems integrator, you transform complex technology into business value for your industrial clients. Today, this means helping those clients capitalize on the many opportunities presented with Industry…
Apache needed a way to use real-time data to help increase efficiency, drive and improve performance, significantly lower well costs, and to be able to make better data-driven strategic decisions in real-time.
Spin needed to create an industry specific product software offer in the Electric Utility and Alternative energy market.
Mesa’s System Integration team was hired by a boiler manufacturing facility located in middle Tennessee to engineer a new boiler test station solution for the company. The project scope required the system to retrieve test parameters from a remote SAP PI system located in Ohio.
FactoryStudio powered by FrameworX allows our OEM partners to be even more flexible in creating HMI solutions that are tailored to the needs of their customers. Therefore, you can design user interfaces that are even more user-friendly. Companies in the food, beverage, CPG and pharmaceutical industries demand HMIs be easily customizable and easy-to-use.
The goal was to allow for better control and monitoring for the company’s processes, which included designing and controlling the compression systems; managing gas; and controlling the production of the Condensed Natural Gas (CNG) dispensers.
The goal was to monitor the equipment throughout the Cargill Feed Safety Research Center (FSRC) and within potentially contaminated areas.
They needed to create an automated system to collect data from across the entire dairy, including the milk supply, flash pasteurizer, tank farm, and CIP- station (cleaning) sections from four independent PLCs.
They needed to modernize their SCADA system by replacing the legacy Opto 22 and Wonderware system to provide Operator Interface, Data Collection, and management of Alarms for refrigeration control system.