Electrical Pack

FrameworX for Power Systems

Build substation, solar plant and data center SCADA on FrameworX with the Electrical Pack: utility protocols, an electrical template and live single line diagrams.

Get the December 10 video What the Electrical Pack adds OPEN230 kV69 kV
4Utility protocols: IEC 61850, IEC 60870-5, ICCP and DNP3
4Demo plants with their own simulators
186Points already defined in the breaker model
AnyFrameworX edition, enabled by the license
In short

The Electrical Pack puts a ready power system toolkit on any FrameworX license. It adds IEC 61850, IEC 60870-5-101 and 104, ICCP (IEC 60870-6 TASE.2) and DNP3 connectivity, an electrical template with breakers, disconnectors, transformers and generators, and single line diagrams that energize live through a built in power flow engine. Operators switch with select before operate and interlocks. Every FrameworX module remains included.

What does the Electrical Pack add to FrameworX?

FrameworX platformDisplays · Alarms · Historian · Scripting · Security · 110+ connectorsELECTRICAL PACKUtility protocolsIEC 61850 · IEC 60870-5ICCP · DNP3Electrical templateSymbols · equipment · dialogsLive single linesPower flow engine

Utility protocols

IEC 61850 for protection relays and IEDs, IEC 60870-5-101 and 104 for telecontrol, ICCP for control center to control center, and DNP3, each beside the 110+ connectors every FrameworX license already carries.

An electrical template that already runs

Layouts, menu, header, alarm bar, security, alarms, historian, the electrical symbols, an equipment model for every piece of equipment, and the operator dialogs.

Single line diagrams that energize live

Draw the network with the electrical symbols and the Connector tool. At runtime the power flow engine energizes it from its sources and colors every line by voltage level.

Which utility protocols does FrameworX support?

IEDs and relaysIEC 61850 clientRTUsIEC 60870-5-101 / 104 masterControl centersICCP · 104 · DNP3OutstationsDNP3 masterFrameworXUnified Namespace
ProtocolRoleInterfaceWhat it brings
IEC 61850 Edition 2Client (MMS)TCP/IPBrowse a live IED or its SCL file (ICD, SCD, CID); buffered and unbuffered reports; COMTRADE fault records downloaded to a folder; select before operate with interlock and synchrocheck flags; backup station for redundant IEDs.
IEC 60870-5-101Master and slaveSerial or TCP/IPTime-tagged events stored in UTC, general and counter interrogation, clock synchronization, select and execute commands.
IEC 60870-5-104Master and slaveTCP/IPSpontaneous data, command password and a 30 second age check on every command, command signalling that ties a command to the point confirming it, allowed client IPs on the slave.
IEC 60870-6 ICCP TASE.2Client, server, or both in one channelTCP/IP, optional TLSControl center to control center. Conformance blocks 1, 2, 4 and 5; data set transfer sets that report changes by exception; commands and set points, direct or select before operate; bilateral tables for access control; a primary and a backup server station.
DNP3Master and slave serverSerial or TCP/IP, optional TLSEvent classes 1, 2 and 3 and class 0 integrity data from outstations; FrameworX tags served to a DNP3 master.

How does a single line diagram know where the power is?

ONE BREAKER TRIPS69 kV busFeeder 1: still energizedFeeder 3: still energizedFeeder 2 tripsEvery section it feeds goes darkfrom the connections, no sensor needed

Every display with connected electrical symbols runs its own power flow engine. On each refresh it starts from every running source and walks the network: closed breakers, disconnectors and fuses pass power, open ones stop it, transformers change the voltage, and busbars join every line connected to them.

The engine then colors each line by its voltage level, and everything behind an open device shows as de-energized. Switching devices take their own color for closed, open, intermediate and inconsistent, and a position that arrives with bad quality shows in a different shade. Rings and loops are handled, because each element is visited once per walk.

A failure propagates on the screen. When a breaker trips or a device fails, the diagram shows the consequence on the next refresh: every line, bus and load that device feeds turns de-energized, and the rest of the plant stays lit. The engine works this out from the connections you drew, so the affected sections show even where the field has no sensor of its own. Every demo plant ships with fault scenarios to try it, from a ground fault trip on a feeder to the loss of a utility source.

Voltage and switching colors live in two tables. Change a color once, and every diagram in the solution follows.

How do I build a single line diagram in FrameworX?

1TemplateNew solution fromthe Electrical Template2EquipmentOne tag per breaker,transformer or generator3DrawSymbols, connectors,bindings4RunSave, start, andit energizes

Model the equipment once. Each piece of equipment is one tag, typed with its equipment model. A breaker arrives with 186 points already defined, from commands and positions to distance, overcurrent, reclosing, synchronism and teleprotection. A transformer carries the tap changer, forced air, Buchholz, temperatures and oil level. You map the field points once, and the power flow engine and the operator dialogs read the same members.

Test it at your desk. Turn on Simulation in the header, and each breaker follows its own commands, so the whole diagram can be operated before a single device is connected.

Or build it with the AI Designer

Engineers describe the substation in plain language, and FrameworX builds the configuration in the Designer while they watch: the equipment tags, the devices and their points, the alarms and the displays. The result comes out structurally right, and the engineer adjusts sizing, alignment and the final polish by hand.

Three MCP servers, all modules included, all released and supported today.

How do operators switch equipment safely?

Opening releasedNo lockout ticketRemote modeOPENEvery condition with its live state: green is satisfied, red is not.

A dialog for every piece of equipment

Click any breaker, transformer or generator, and its dialog opens, built from that equipment's own points. New equipment is ready to operate as soon as its symbol is placed and bound.

Interlocks you can read

Every command has an interlock shown as a lock: red is blocked, green is free. Click the lock and the permissive logic opens as a ladder, with every condition and its live state. With no field data, the releases read blocked, which is the safe state.

Select before operate, tickets and audit trail

Commands go out as select, then operate. A white ticket marks caution; a red lockout ticket blocks open and close on that equipment. Every ticket, and every operator action, goes to the audit trail.

Which plants can I see running?

Four demo plants run in the demo solution: a 230/69 kV substation, a 120 MWp solar plant, a mining substation and a Tier III data center. Each one runs its own simulator, with fault scenarios you trigger with one button and a restore. Study the one closest to yours, then build your own from the Electrical Template.

230/69 kV substation

Two 230 kV lines and two generating units, two transformers to the 69 kV buses. Tap changer regulation and a transformer thermal model; scenarios from a feeder ground fault to a differential trip with bus transfer and a heat wave.

120 MWp solar plant

A 138 kV line, a 150 MVA three winding transformer and six 20 MWp inverter circuits. Irradiance over an accelerated day, reactive control with a capacitor bank by day and a shunt reactor at night; cloud passage, inverter trip and curtailment.

Mining substation

Two 40 MVA transformers to two 13.8 kV buses with a normally open tie, a ball mill on a variable frequency drive, a crusher, a harmonic filter and a motor control center. Loss of utility sheds load and starts the emergency generator.

Tier III data center

Two independent sides, each with a utility feed, a generator on an automatic transfer switch and a UPS on the critical bus; dual cord racks. Utility failure, generator start failure, UPS failure and battery autonomy.

How does it scale from one substation to a utility?

ActiveserverStandbyin syncSite 1FrameworXSite 2FrameworXSite 3FrameworXSite 4FrameworXSite 5FrameworXEach site keeps its own data through a network outage and sends it when the link returns.

Each site runs FrameworX next to its devices and publishes up to the control center as an IEC 60870-5-104 or DNP3 slave. At the center, a hot-standby pair keeps the system running: the standby server stays in sync with the active one and takes over when it fails, usually within one second to a few seconds. Any FrameworX solution deploys as a redundant pair from a configuration dialog, with no custom programming.

This architecture is in the field today. A utility with solar and hydro generation runs FrameworX across five substations and 250,000 points, reading field devices on Modbus and passing data to its operation center over DNP3, with store and forward at each site and a redundant central pair.

How is the Electrical Pack licensed?

The Electrical Pack is enabled by the license and works with any edition. There is nothing to activate inside the solution: the license that runs FrameworX on a computer enables the Electrical Pack on that computer, and Solution Center lists it on the License page.

Electrical Template solutions run on the Windows platform. Single line diagrams and equipment dialogs open in the Rich Client and the Smart Client.

Electrical Pack: USD 6,000 over the base license.

Prefer a finished utility SCADA? Our partners build complete products on FrameworX, such as Action.NET by SPIN.

Common questions

What is the FrameworX Electrical Pack?

The Electrical Pack is a power system toolkit for FrameworX, the SCADA and HMI software from Tatsoft. It adds IEC 61850, IEC 60870-5-101 and 104, ICCP (IEC 60870-6 TASE.2) and DNP3 connectivity, an electrical template with breakers, disconnectors, transformers and generators, and single line diagrams that energize live through a built in power flow engine. Every FrameworX module remains included.

Which protocols does the Electrical Pack include?

An IEC 61850 Edition 2 client over MMS; IEC 60870-5-101 master and slave over serial or TCP/IP; IEC 60870-5-104 master and slave over TCP/IP; ICCP (IEC 60870-6 TASE.2) client and server over TCP/IP; and DNP3 master and slave server. They sit beside the 110+ connectors every FrameworX license already includes.

What is a live single line diagram?

A single line diagram that shows where the power is. While the display is open, the power flow engine walks the network from each running source: closed breakers and disconnectors pass power, open ones stop it, and transformers change the voltage. Each line is colored by its voltage level, and everything behind an open device shows as de-energized.

Does the Electrical Pack work with every FrameworX edition?

Yes. The Electrical Pack is enabled by the license and works with any edition. There is nothing to activate inside the solution: the license that runs FrameworX on a computer enables the Electrical Pack on that computer.

Can I test a single line diagram without field devices?

Yes. Turn on Simulation in the header of the Electrical Template, and each breaker, disconnector and generator follows its own commands, so the whole diagram can be operated and tested before any device is connected.

How do operators switch equipment safely?

Each piece of equipment opens a dialog built from its own points. Every command has an interlock shown as a red or green lock, and the permissive logic can be opened as a ladder with the live state of each condition. Commands go out as select before operate, and a red lockout ticket blocks open and close on that equipment, with every ticket written to the audit trail.

Can FrameworX send substation data to a control center?

Yes. As an IEC 60870-5-104 or DNP3 slave, FrameworX publishes its tags to an upper level master such as a control center, and it executes the commands that master sends. Between control centers, FrameworX exchanges data over ICCP (IEC 60870-6 TASE.2), as client, server or both.

Which demo plants come with the Electrical Pack?

Four demo plants run in the Electrical Pack demo solution, each with its own simulator and fault scenarios: a 230/69 kV substation, a 120 MWp solar plant, a mining substation and a Tier III data center. Your own project starts from the Electrical Template.

How is the Electrical Pack priced?

Electrical Pack: USD 6,000 over the base license.

From the relay in the field to the control center, on one platform.

Utility protocols, equipment models with every point already defined, single lines that know where the power is, and every FrameworX module included. One Platform. No Limits. Build Once. Deploy Anywhere.

Aim High. Start Simple. Scale Without Limits.

Get the December 10 video Contact us

Last reviewed November 2026.